Acumatica Cloud ERP · Vietnam localization
Construction equipment management on Acumatica, where each machine is, when it is available, which project pays.
A module developed by S4 for construction companies running Acumatica: it follows each machine from purchase, planning and dispatch across sites to rentals, operation, maintenance and disposal. Costs of owned and rented machines flow to the right project and the Vietnamese books.

Why it matters
What does equipment management in the ERP solve?
Machines are a contractor’s biggest assets and hardest cost to control. The module brings plans, dispatch, machine logs and costs into one system.
No double-booked machines
The dispatch board checks schedule conflicts, including dismantling, transport and assembly days.
Machine shifts cannot be inflated
Logs block duplicate shifts and meters running backwards; sites confirm before charges are calculated.
Machine cost lands on the right project
Depreciation of owned machines, shift costs and rental charges post by project and cost code.
Features
What does the construction equipment module do?
Asset cards from receipts
Purchase receipts propose asset cards; additions and depreciation follow Vietnamese rules; QR labels per machine.
Equipment plans by project
Owned and rented machines per site, compared with the equipment cost budget before approval.
Fleet dispatch board
One row per machine, one bar per site; drag demand onto a machine and see when each one is available.
Handover with records
Transfer orders compute dismantling, transport and assembly days; receipts record condition and meter.
Contracts from requests
Rent by shift, by volume or by month; rented machines appear on the dispatch board next to owned ones.
Machine logs
Run and idle hours, meters, fuel and output; machine timecards generated from confirmed logs.
Maintenance, repair, inspection
Reminders by hours and dates; repair orders with parts; machines with expired inspection cannot be dispatched.
Idle machines, rent-out
List of long-idle machines; rent-out contracts; overdue returns flagged, extensions checked against the schedule.
Rentals, depreciation, reconciliation
Rental charges from confirmed quantities and AP bills; straight-line depreciation posted by project.
Full disposal procedure
Committee, conclusion, approval; disposal document, sales invoice and disposal record in the statutory form.
Machine shift rates
Shift rates by machine, class or project with effective dates; built by component per Circular 13/2021/TT-BXD.
Scaffolding, formwork, tools
Issue, allocate and return small tools by site.
Dispatch board
One screen shows which machines are available and which are overloaded
Each row is a machine; each bar is a site or a status: in transit, under repair, rented out, reserved. The equipment department drags demand onto machines; weekly load cells change colour when over capacity.
- Conflict checks include dismantling, transport and assembly days.
- Right-click to open the document or create a repair order.

Rentals
Rented machines go straight from plan to bill
Rental demand flows from the plan to the request and then into a contract without re-entry. The contract is pre-filled with machine type, site and dates; choose the vendor, pricing basis and rate.
- Price by shift, by volume or by month (pro-rated by days in the period).
- Charges come from shifts and volumes confirmed by the site.
- AP bills carry project and cost code and start on hold for checking.

Machine logs
Sites confirm, shifts cannot be inflated
Operators record setup, run and idle hours, meters, fuel and output; shifts are calculated. Once the site manager confirms, machine meters update and hour-based maintenance comes due.
- Duplicate shifts and backward meters are blocked.
- Same log for owned and rented machines.
- Machine timecards bring shift costs into projects.

Maintenance and inspection
Maintenance and inspection dates flagged ahead
The reminder list gathers upcoming maintenance, safety inspections, registrations and return dates. Repair orders are created from the dispatch board with labour, outside services and parts issued from stock.
- Tower cranes with expired inspection cannot be moved to another site.

Plans and budget
Planned machine cost checked against the project budget
The site manager plans owned and rented machines for the project and compares them with the equipment cost budget before the project director approves. Approved plans generate requests with no second approval.

Controls
How does the module control machine cost and risk?
Conflicts are blocked in dispatch, transfers and extensions.
Duplicate shifts and backward meters are blocked; logs need site confirmation.
Rental bills follow confirmed shifts and volumes, not the vendor statement.
Machines with expired inspection cannot go to a site.
Equipment department, site manager, operator, accountant, project director.
Additions, depreciation and disposals follow Vietnamese rules and forms.
Fit and implementation
Which companies is it for?
General and specialist contractors
Companies whose fleet moves between sites and who need to know where machines are and what each project costs.
Heavy equipment renters
Companies renting cranes, excavators and concrete pumps by shift, volume or month who need to check charges against actual work.
With S4 Consulting
S4 Consulting, Acumatica Gold Partner in Vietnam, configures equipment classes, roles and shift rates and trains equipment and site teams.
Acumatica localization
Other S4 packages on Acumatica
FAQ
About construction equipment management
Can’t find your answer? Send your question to an S4 expert.
Construction equipment management
One system for the whole machine lifecycle.
S4 Consulting is Acumatica Gold Partner in Vietnam. Contact S4 to see the module running with your fleet and sites.